New Infrastructure at Belgrade Nikola Tesla Airport Passes Strictest Tests
Let us remind that, as part of the preliminary works on the modernization of the infrastructure and the expansion of passenger capacities, the company Belgrade Airport has built a new waiting room for access to remote positions, with a total of 130 seats on the ground floor of Terminal A and two direct exits to the platform.
– The waiting room is fully adapted to all passenger categories, and the materials, the range of colors and the textures match the recognizable Vinci standard, so this is an example of the future appearance of the airport's interior. A few days after this test, the new waiting rooms, A7a and A7b, will be ready for operating use, and their use will depend on the capacities in line with the global Covid-19 pandemic – the company says.
Top priče
25.04.2024. | Građevina, Turizam, sport, kultura
The Municipality of Cajetina has opened the tender for the preparation of the general project, preliminary design and approval planning for the Miladin Pecinar dam on Zlatibor. The value of the procurement is estimated at RSD 8.7 million. On the profile that the Municipality has set, on the nameless stream which flows into the Cestar Stream (in the Krst location), the construction of a gravity concrete dam is planned for the purpose of creating
16.04.2024. | News
Economy Fair in Mostar opens – 26 companies from Serbia exhibiting
16.04.2024. | News
eKapija+
24.04.2024. | Energija, Industrija, IT, Telekomunikacije
Energy Net - Energy is at the core of our business
24.04.2024. | Energija, Industrija, IT, Telekomunikacije