Opening of Master center of Novi Sad's Fair, in which about 20 million EUR were invested, on May 12, 2006
Director General of the Novi Sad Fair, Aleksandar Andrejević, confirmed that the fair-congress and business-trade Master Center at the Novi Sad Fair would be officially opened on May 12, 2006.
The Master Center was built in two phases. In the first one, three years ago, the hall was built on 6,500 square meters, whereas in the second phase, the business center with 13,000 square meters and the congress center with 2,700 square meters of space were built. The construction and equipping of the Center cost about 20 million EUR.
The headquarters of the ASsociation of Fairs of Southeast Europe will be settled in the business center. That Association has 21 fairs from the region for its members. The competitive advantage for the companies that choose to settle in that center will be connection to the Network of European Business Centers whose headquarters is in Zurich.
In addition to the organization of congresses, the Master Center will satisfy the needs for promotion of companies and business projects, training and professional specialization.
Top priče
28.03.2024. | Građevina
Within the realization of the project “Construction of the Dam with the Reservoir Arilje-Svrackovo Profile”, the works on diverting the Rzav river through a hydro tunnel, which will enable the excavation and construction works on the establishment of the cofferdam and the dam and all the other works in the phase of the diversion of the river, the company Srbijavode announced. The director of Srbijavode, Goran Puzovic, took a tour of the
eKapija+
27.03.2024. | Turizam, sport, kultura
Hotel Crowne Plaza Belgrade got a new guise
27.03.2024. | Turizam, sport, kultura
27.03.2024. | IT, Telekomunikacije, Turizam, sport, kultura
27.03.2024. | IT, Telekomunikacije, Turizam, sport, kultura