Winning Design Selected at Contest for Studentski Grad in Belgrade – Works Should Start in Second Half of 2024

Source: eKapija Tuesday, 07.02.2023. 14:34
Comments
Podeli
First-prize design by Nous Architecture studio from Turkey (Photo: Nous Architecture)First-prize design by Nous Architecture studio from Turkey
At an exhibition at the Palace of Serbia, the design which won the public international architectural-urban planning contest “Studentski grad - Beograd” was presented.

Considering the need for increasing the accommodation capacities of the students’ homes within the university center, the Ministry of Education, with the support of the United Nations Development Program (UNDP), had opened the contest for the development of the complex, the construction of new facilities at the Studentski Grad complex in New Belgrade and the reconstruction of the existing ones, the announcement says. The contest was carried out by the Union of Architects of Serbia.

A total of 21 applications was sent in response to the contest, and the jury, presided over by architect Dr Grozdana Sisovic, unanimously decided to award first prize (USD 28,000) to the Nous Architecture studio from Turkey. From the total prize fund of USD 56,000, aside from first prize, two designs were awarded with USD 7,000 each, whereas another five designs were awarded with USD 2,800 each.


Based on the winning design, as the next step, what follows is the preparation of the urban planning-technical and project documentation, after which the ministry will publish the tender for the execution of the works, which should begin in the second half of 2024.

Comments
Your comment

Top priče

26.03.2024.  |  Saobraćaj

Tender for Expert Supervision Over Planning and Construction of New Railroad Jovanovac – Cvetojevac Junction – Sobovica Published

The company Serbian Railways Infrastructure has published the tender for expert supervision over the planning and construction of the new railroad Jovanovac – Cvetojevac Junction – Sobovica. As clarified, the forming of the new industrial zone Sobovica has caused the need for its connecting with the existing railroad infrastructure, that is, the Lapovo – Kraljevo – Lesak – Kosovo Polje – Djeneral Jankovic – state border (Volkovo)

Full information is available only to commercial users-subscribers and it is necessary to log in.

Forgot your password? Click here HERE

For free test use, click HERE

Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.