First phase of integrated protection at Pancevo Oil Refinery completed – New measures prevent unauthorized access and terrorist attacks

Source: eKapija Sunday, 28.06.2020. 14:31
Comments
Podeli
Illustration (Photo: Dmitry Kalinovsky/shutterstock.com)Illustration
After over two years, the first phase of implementing the integrated protection system at Pancevo Oil Refinery, a part of Naftna Industrija Srbije (NIS). Alarm Automatika, Ltd. joined the project in the phase of creating technical solutions in compliance with the project task and corporate protection department guidelines.

The solution designed will prevent unauthorized access and terrorists attacks while maintaining traffic flow and the established behaviour protocol. The solution defines the construction, metalworking and electronic elements and their implementation. After pinpointing the compromised points of entry and analyzing traffic (number and dimensions of vehicles) conceptual solution for new traffic regulation was designed, It principally consists of integrated system of safety barriers, ramps and traffic lights easily managed by the vehicle operator, and the horizontal and vertical signalization and anti-terrorist barriers able to stop heavy-duty trucks.

Together with partner companies DBS Konsel Security Service, Termoelektro Enel a.d. and Strabag d.o.o., Alarm Automatika delivered a surveillance system,and access control system, LPR cameras and perimeter security system.


All systems of technical security are integrated through Alarm Automatika's ABSistemDCi® software and are centrally manged from the refinery's operative center.
Comments
Your comment

Top priče

28.03.2024.  |  Građevina

Beginning of Construction of First “Green Dam” in Serbia Which Will Supply 500,000 People with Drinking Water

Within the realization of the project “Construction of the Dam with the Reservoir Arilje-Svrackovo Profile”, the works on diverting the Rzav river through a hydro tunnel, which will enable the excavation and construction works on the establishment of the cofferdam and the dam and all the other works in the phase of the diversion of the river, the company Srbijavode announced. The director of Srbijavode, Goran Puzovic, took a tour of the

Izdvajamo još...

Full information is available only to commercial users-subscribers and it is necessary to log in.

Forgot your password? Click here HERE

For free test use, click HERE

Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.