Agreement on highway from Pozega to Duga Poljana to be signed in 2020?
Talking about highways, Vucic reminded that the highway between Surcin and Obrenovac was to open ten days later and that the section from Preljina to Pozega on that route was also being built.
– A section of less than 107 kilometers to Boljare on the Montengrin border remains to be done. The first section to be done is the one between Pozega and Duga Poljana, located between Sjenica and Novi Pazar, and I believe that we will be able to sign an agreement on that section next year – Vucic said.
Top priče
28.03.2024. | Građevina
Within the realization of the project “Construction of the Dam with the Reservoir Arilje-Svrackovo Profile”, the works on diverting the Rzav river through a hydro tunnel, which will enable the excavation and construction works on the establishment of the cofferdam and the dam and all the other works in the phase of the diversion of the river, the company Srbijavode announced. The director of Srbijavode, Goran Puzovic, took a tour of the
eKapija+
27.03.2024. | Turizam, sport, kultura
Hotel Crowne Plaza Belgrade got a new guise
27.03.2024. | Turizam, sport, kultura
27.03.2024. | IT, Telekomunikacije, Turizam, sport, kultura
27.03.2024. | IT, Telekomunikacije, Turizam, sport, kultura