Framework Agreement for Belgrade-Nis-Presevo Railway to be Signed Soon
– The final analysis, before the signing of the framework agreement for the construction of the Belgrade-Nis-Presevo fast railway, the construction of new sections of the railway system in Serbia and the modernization of the existing ones – Vucic announced on Instagram.
As he said, railway transport is part of the green agenda of modern Europe, but also part of the economy which contributes to growth at a great rate.
– In the next two months, we expect big agreements and big contracts for our country – the president wrote.
He also uploaded photographs showing him analyzing the map of railways in Serbia together with the head of the cabinet, Ivica Kojic.
Top priče
28.03.2024. | Građevina
Within the realization of the project “Construction of the Dam with the Reservoir Arilje-Svrackovo Profile”, the works on diverting the Rzav river through a hydro tunnel, which will enable the excavation and construction works on the establishment of the cofferdam and the dam and all the other works in the phase of the diversion of the river, the company Srbijavode announced. The director of Srbijavode, Goran Puzovic, took a tour of the
eKapija+
27.03.2024. | Turizam, sport, kultura
Hotel Crowne Plaza Belgrade got a new guise
27.03.2024. | Turizam, sport, kultura
27.03.2024. | IT, Telekomunikacije, Turizam, sport, kultura
27.03.2024. | IT, Telekomunikacije, Turizam, sport, kultura